GROUND & STRUCTURE INTELLIGENCE

Control the next 8 weeks.
Before they control you.

SiteCaptain is AI-powered execution control built for piling, shoring, earthworks, and concrete contractors. It measures manhours, tracks production rates, and flags schedule risk before it becomes a claim.

3
Variance Dimensions
8
Week Lookahead
4
Trade Packs
<60s
Daily Report to Alert

You find out too late.

  • Rig downtime goes unreported until the weekly meeting
  • Crew shortage compounds silently over 3-4 days
  • Production rates drift below plan with no early warning
  • Delay drivers repeat across projects but nobody connects them
  • The PM discovers a 2-week slip when it's already a claim

Know today. Act today.

  • Foreman submits a 2-minute daily report from site
  • AI compares actual manhours against the 8-week plan instantly
  • Production rate variance calculated per activity automatically
  • RED/AMBER alerts hit your inbox and Telegram within 60 seconds
  • Cross-project patterns surface before they repeat

One cycle. Three inputs. Full control.

SiteCaptain runs on a simple daily loop: the PM sets the plan, the foreman reports reality, and the AI tells you what's drifting.

1

PM Uploads 8-Week Plan

The Program Manager fills a simple Google Sheet with planned manhours per activity, per week (W1-W8), plus target production rate (LM/manhour, m³/manhour). One row per activity. Mark READY and it auto-uploads.

2

Foreman Reports Daily

A 2-minute Tally form captures: crew count, actual hours, actual quantity completed (LM, m², m³), delay status, and delay driver. Up to 3 activities per report. Submitted from the phone on site.

3

AI Analyzes & Alerts

Within 60 seconds: variance calculated on 3 dimensions, trade-specific AI scores risk as GREEN/AMBER/RED, deterministic rules override when needed, and alerts fire to Gmail + Telegram with recommended actions.

4

Weekly Intelligence Report

Every Monday: a full portfolio summary with trend analysis, open issue carry-forward, recovery action tracking, and cross-project pattern signals. Sent automatically to the PM and Program Manager.

5

Mid-Cycle Plan Revision

Schedule changed? PM updates the Plan Upload sheet, marks READY, and clicks one link. SiteCaptain archives the old baseline and recalibrates all future comparisons instantly. No waiting until Monday.

6

Portfolio Dashboard

A live Google Sheet dashboard shows all projects, all activities, with color-coded risk levels, manhour variance, production efficiency, and escalation history. Updated in real-time by every report.

Three signals. One verdict.

Every activity is measured on three independent variance dimensions. The AI weighs all three to determine risk level.

Manhours Variance

Planned manhours this week vs. actual manhours reported. Catches under-resourcing and over-run before the end of the week.

actual_mh - planned_mh = variance
👷

Crew Variance

Planned crew count vs. actual crew on site. A crew shortage of -30% or more triggers an automatic RED override regardless of AI assessment.

(actual - planned) / planned × 100%
📈

Production Variance

Target LM/manhour vs. actual LM/manhour. Built from real site output: actual quantity completed ÷ actual manhours = real production rate.

efficiency = actual_rate / target_rate × 100%
RED ALERT — Bored Piling
Project: Dubai Tower — PRJ-001
Activity: Bored Piling (CFA 600mm)

Why this matters:
Manhours: 32h actual vs 48h planned (-33%)
Crew: 4 vs 6 planned (-33%)
Production: 1.8 LM/mh vs 2.5 target (72%)
7-day delay accumulation: 14.5h (3 events)

Recommended action: Confirm rig support equipment availability. Check if cage delivery schedule is synchronized with boring sequence. Protect workfront continuity for next shift.

SiteCaptain is a management recommendation tool. It does not provide legal, contractual, or entitlement determinations.

Built for your trade. Not generic construction.

Each trade pack ships with pre-loaded activities, production units, delay vocabularies, and AI prompts calibrated to how your trade actually works.

🚫

Piling

Bored piles (CFA, rotary), driven piles, micropiles, load testing. Units: LM/manhour. Vocabulary from Bauer, Keller, Soletanche Bachy.

12 Activities • LM/manhour
🏗

Shoring

Sheet piles, secant walls, soldier piles, combi-walls, diaphragm walls, ground anchors. Units: m²/manhour, LM/manhour.

10 Activities • m²/manhour
🏘

Earthworks

Excavation, grading, backfill, compaction, dewatering, site preparation. Units: m³/manhour.

9 Activities • m³/manhour
🧱

Concrete

Formwork, rebar fixing, concrete pour, curing, stripping, post-tension. Units: m³/manhour, m²/manhour.

11 Activities • m³ & m²/manhour

Three roles. One system.

👷 Foreman

2-minute daily form from site. Report crew, hours, quantity completed, delays. No spreadsheets, no laptop needed. Just a phone and 2 minutes at end of shift.

💼 Project Manager

Upload an 8-week plan as a simple table. Receive daily RED/AMBER alerts with AI-recommended actions. Weekly intelligence report every Monday. Full activity-level dashboard.

🏆 Program Manager

Portfolio-level oversight across all projects. Cross-project pattern detection. Monthly intelligence reports. Set production targets and review contractor performance at trade level.

Ready to control your next 8 weeks?

SiteCaptain is currently onboarding pilot contractors in piling, shoring, earthworks, and concrete. Get early access and shape the product with your real project data.